Stock Underpass
Location: Cromwell-Luggate Highway
Contrax (Central) Ltd was the principal earthworks contractor on the Tinwald Underpass project.
Involvement:
- 
Constructed and maintained a new two lane diversion road around the main worksite on state highway 6. 
- 
Setup underpass work area including survey set out,safety fencing creating safe work zones. 
- 
Excavate trench for underpass to correct depth, work around (protection of underground Chorus cables),and compact foundation. 
- 
Place compact and test backfill, 
- 
Install soak pits and dewater concrete sump for dewatering pump, 
- 
Form new road subgrade road shoulders and seal, 
- 
Excavate access ramps, reinstate new boundary fences. 
We worked closely with subcontractor’s onsite to ensure safety when approaching different tasks of the project.
Horticulture Development
Project: Cherry Orchard Development
Location: Mt Pisa, Cromwell
Size of Project: 80 Hectares
Involvement:
- 
Ripping of land and rock clearing using Bulldozers, Excavators and Tractor Trailer 
- 
Create and maintain access roads 
- 
Contouring gullies 
- 
Removal of old water races, fences, water structures 
- 
Leveling of water dykes 
- 
Fence line preparation 

Land Conversion
Location: Bendigo Downs
- 
House Pad 
- 
Cherry Development 
- 
 
Involvement:
- 
Create a new access road / driveway for new section 
- 
Dig out house foundations 
- 
Deep rip land for cherries to be planted 
- 
Installation for water pipes and tanks 

Viticulture Development
Location: South Edge Vineyard, Alexandra
Involvement:
- 
Tree Felling 
- 
Foundations for house pad 
- 
Rockwall formation 

Ballantyne Road
Project: Ballantyne Road Safety Improvements
Location: Ballantyne Road, Wanaka
Involvement:
Contrax (Central) Ltd are responsible for all Earthworks along Ballantyne Road for upgrading the road to be sealed.
Tasks being Performed:
- 
Tree Felling along Ballantyne Road – Removal of Stumps and Trees 
- 
Excavation for Carting waste soils to widen Road 
- 
Engineered filling of some places and Green Terramesh retaining structures built. 
- 
Cart and place of AP65 gravel along Road 